I need to see slope on the Longsection as a Ratio (not percentage)
We set our drawings in design setting as a slope Ratio, when producing the longsection they come out as percentage always. but it should come out as a ratio as per our settings. Why is it important, my Client wants it as a ratio
Allow LFD substructure analysis with an LRFD Superstructure in LEAP Steel
When performing a superstructure replacement, it is common to design the proposed superstructure in LRFD but then analyze the existing substructure capacity in LFD. Currently with LEAP Steel, because the superstructure was designed in LRFD the sub...
Create 3D by slope to terrain needs to have the option for the fill slope to be positive and vise versa for cut slope
When projecting a line to a terrain currently the only option for fill is down and cut is up. This needs to be a user selectable option. There are many cases where the proposed surface is above the existing ground yet the fill projection needs to ...
Elevation analysis needs improved within the profile window. Specifically elevation differences. Either at a single station or point, or minimum distances, etc. In the attached screen shot, I would like to know where my minimum distance occurs bet...
Currently when only one rail alignment can be selected to output a horizontal report. Would be great if the ability to select multiple alignments and output a horizontal report at the same time. Reason: Currently have projects which contain multip...
Please add the correct version number to applications user preference folder. Currently when you browse to Openroads user preference folder you get folders called 10.0.0 and 10.0.0_1. These folders need to contain the version number of Openroads s...
This tool was very useful for placing cells such as "raised pavement markers" at set distance intervals along very long stretches. Without this tool, plans involving tasks such as these, especially in transportation plans, take much longer.