Intuitive ability to upsize a sheet border to scale vs scaling down to size
Currently everything is scaled down to the sheet size. Previously, we our borders were placed at the correct geolocation and manipulated, such that the design was in the correct place and the border was the item moving. Current system moves the de...
Ability in surface creation to move backward. For instance, proposed top mesh for retaining walls will never be correct, because the coping and barrier wall being outside of the wall requires the surface to move in the opposite direction. This can...
Allow Switching Annotation from One Alignment to Another
Ability to change the referenced labeling alignment (can be in properties as a drop down with all available alignments).
For example being able to switch main alignment to a side road alignment
Ability to update profile drawing model element annotation without removing full model annotation.
Currently, the software does not respond to removing element annotation in the profile drawing models. Instead, the entire model needs to have annotations removed, re-annotated, and then the individual elements need to be annotated.
When editing a Complex Terrain Model, clicking Apply closes the dialog box. The user often wants to make additional edits to the Terrain Model. Allow the dialog box to persist until the user closes it.
Include an ability to have a default Start Stationing for an alignment. It would save time (and improve consistency) for several of our alignments where we'd like the default stationing set at 10+00. I imagine many other users could appreciate thi...
In ORD 2023 there is no provision for manually adding non-modelled cut or fill volumes to a mass diagram or earthwork report. Manual volumes are typically used for borrowing sites, waste sites, non-modelled bridge embankments and merging models su...
Add a Surcharge Volume Option for Meshes & Terrains. This would need to function so as to compare the Surcharge to Design and Existing volumes/terrains. Surcharge embankment will always be above finished or existing grade, so consider this as ...