Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
Status Future consideration
Created by Guest
Created on Aug 26, 2024

Calculation of track length

A function that calculates the length of the tracks with turnouts withdrawn would be very helpful to calculate the amount of rails.

The lengths of rails between turnout points 1 - 2 and 1-3 should be automatically redrawn from the lengths and reported as a separate amount.

Civil Product Used OpenRail Designer