Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1646 of 1646

Allow Annotation Groups to use "Place Text Along" from MicroStation

For a plan annotation group, the ability for annotation text on arcs/curves and spirals/transitions to be placed to follow the geometry centreline curvature. The present options only allow the text to be placed as a tangential/perpendicular straig...
about 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

Visible final contour labels in corridor

After the corridor is created, it is possible to see the final contours. However, the contour elevation labels are not shown unless a proposed surface is created. Why is that so? I believe it would be beneficial to toggle on/off contour elevation ...
7 months ago in Modeling / OpenRail Designer / OpenRoads Designer 0 Future consideration

Bring back the “NE=” key-in command.

U.S. surveyors traditionally work in Northing & Easting, in that order. When working with Microstation V8i, AND with Inroads loaded, the user could perform precision drafting by using the “NE= “ key-in to enter the exact northing/easting coord...
over 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 4 Future consideration

Cross reference plan and profile sheet number annotation form Sheet Index

Add ability to cross reference the sheet numbers of plans that are in the sheet index. IE: referencing the profile sheet number on the plan sheet and vice versa.
over 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Ability to have corridor/linear template pivot at end of alignment

Currently when developing a object that is at a skew, whether it be a road, bridge, culvert, or other detail modeling. If the start/end of the object is at a skew compared to the alignment that it is attached to, it is difficult to model. The user...
over 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Superelevation lanes have start and end points by default in tangents

Currently if you place a superelevation lane on a tangent alignment, no points will show up in the superelevation editor. I would like that automatically even in tangent sections, the start and end points are placed in the superelevation editor so...
over 1 year ago in OpenRoads Designer / Superelevation 0 Future consideration

Ability to adjust the face of the inverted-T cap ends

There is an inverted-T bent cap available for use in my organization's template library; however, there is no easily practicable way to adjust the faces of the inverted-T cap ends, including any ear walls that were added. Frequently, we detail inv...
about 1 month ago in OpenBridge Modeler 0 Future consideration

Variable that stores Format Options and makes them predefined in a workspace.

Currently as an OpenRoads Designer user, when the user changes the Format Options, the changes are stored on the user’s computer. This results in many different options being used in delivered reports. I would like to have an environment variable ...
over 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 1 Future consideration

Add Ability to Place Civil Label With View Independent Setting When Using Leader in Civil Labeler

I am needing to enable the View Independent setting in Civil Labeler on text favorites using leaders. For example, I am using text favorites in Civil Labeler (that require leaders) to annotate existing right-of-way and property lines information a...

Selective Annotation Removal for Specific Station Ranges

We already have the ability to add multiple annotation groups to XS. Perhaps I want a group for my R/W Annotation, and then others for slopes, elevations, etc. I can do that. The issue arises when something needs to be updated. Let's say for examp...
3 months ago in Annotation / OpenRail Designer / OpenRoads Designer 0 Future consideration