Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Functional Areas

Showing 956

Add regression report tool for reporting against a control alignment

In Bentley Rail Track you could run a "Regression" report via Tools - XML Re ports - Regression... This was an invaluable way of reporting existing cants, sixfoots, etc. with the figures generated in line with a 'Control Track'.
about 2 years ago in Reports 1 Future consideration

Expand Stationing Favorites to allow truncating trailing zeros.

When using any of the labeling and annotation tools, some situations end up with trailing zeros. When users manually labeled such occurrences, they would omit any trailing zeros. Other distance values allow this type of operation, but stationing d...
6 months ago in Drawing Production / OpenRoads Designer 0 Future consideration

Offset Alignment - Controlled by Station, Offset and Cross Slope.

An OFFSET ALIGNMENT / GEOMETRY CHAIN command would be a gamer changer for ORD. Most of our geometry including "edge of pavement", "curb" and "ditches" are controlled by station offset cross slope from a control line. Currently to create offset geo...
about 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Checkbox to turn on-/off alignments

It would be useful to be able to turn on-/off single alignments. Perhaps with a checkbox in the "OpenRail Model" section in the explorer, just like the ones in the "Feature definition" section in OpenRail Standards. This could probably be handy wi...
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Text Favorite cross section slope - hide trailing zeros

We are able to format most text favorites to hide trailing zeros. However, we are not able to hide trailing zeros for text favorites for Cross Section Annotations > Segments > Slope. We can define the precision, but there is no option to hid...
over 1 year ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add .JXL file format

It would be nice if the Trimble Link Import op tion of ORD Survey would allow for .JXL file format to import.
almost 2 years ago in Import/Export / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 1 Future consideration

Being able to add/remove references that are stored inside cross sectional saved view

Rather than creating a new cross sectional named boundary, it would be convenient for the saved views to synchronize with 3D reference window and level display. There could even be a feature to toggle this feature on and off for a saved view.
10 months ago in Drawing Production / OpenRail Designer / OpenRoads Designer 0 Future consideration

Ability to generate aggregated quantity report for all components linked to a price list

As a road designer, I would like to be able to produce a report aggregating all quantities for all components for a project, items in this reporting being linked to a price list.With Item types and Reports we have ability to generate data, but for...
almost 2 years ago in Item Types / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Single Offset Partial/Entire Element creates complex elements with the ability to add/remove tapers

One of the factors prohibiting the use of civil geometry in plan production is that it can often feel cumbersome to implement design changes without 'breaking' your previous work. Let's say you have an intersection designed using civil geometry, a...
10 months ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

No subtraction of sleepers from ballast in corridor report

Corridor report does not subtract the volume of sleepers we added to the model from the ballast. I propose to add in the next version of ORD the possibility to subtract in the ballast the added sleepers.
3 months ago in OpenRail Designer / Reports 0 Future consideration