Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1273

[Terrain] Flow arrows with slope percentages

Need ability to toggle slope percentage annotations above/below the flow arrows on terrains. This will help with design and analysis. An option could be added in the flow arrow properties, please refer to the attached snapshot.
8 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 1 Future consideration

Reassign/Reattach Civil Labels

It would be nice to have the ability to reattach civil labels to a new element or terrain. A good example is for jointing/geometric sheets with a lot of spot elevations. Fairly often a new terrain is created and the spots break and need to be repl...
over 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 7 Future consideration

User option for linear stroking when creating terrains while processing field data in 3d files.

It would be very useful to big back the user option for stroking linear elements when creating terrains. This was available in v8i and greatly enhanced our surface models. Right now there is a configuration variable but it can't be set by users. A...
11 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey / Terrain 6 Future consideration

Allow the road slope to exceed the gutter cross slope

My state agency commonly uses gutters with a 4% cross slope. The maximum superelevation rate is 7%. The gutter slope stays at 4% in this situation. Spread does not compute in this scenario because "A depressed gutter must have a Gutter Cross Slope...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Product Alignment of file vs File Schema - Need better compatibility between platform products in the same generation/schema

Please update the OpenX product(s) so that any DGN can be opened for editing no matter what product authored the file as long as it remains in the same Major schema version Suggest any DGN can be opened by any product (Site/Rail/Road/Bridge) regar...

Allow for custom line styles to be synced with "update from dgn lib"

When a custom line style is updated in the workspace, it does not update existing files that have used the previous line style (of the same name). The only workaround is to: Manually delete all of the line styles you want to update Remove the defi...
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 0 Future consideration

Profile along sight visibility lines

When creating sight visibility a 3D model is created with sight lines. Currently these sight lines are not able to be individually selected to provide a profile along the line. This option was available in MX SS4 and useful for checking some obstr...
13 days ago in Analytics / OpenRoads Designer 0 Future consideration

Option to show Stopping Sight Distance instead of K-Value for vertical parabolas

Current default setting shows Vertical Curve Parameter or K-Value below the parabola length in the dynamic display of a vertical alignment. The geometry report has to be run or the annotation must be displayed to see the available SSD. It would be...
24 days ago in Annotation / Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Ability to Place a Conduit/Pipe "Without" a Node

Many times, we have conduits/pipes that simply daylight a surface and drain on to the ground or into a pond. Please add the ability to place conduit/pipes "Without" the need of a Node. I understand that we can create a sort of null point/node that...

Ability to annotate models over a station range

Currently, the only way to update Annotation is to update ALL or one drawing model at a time. It would be very helpful to be able to select a station range to remove and then update in one action.
over 2 years ago in Annotation / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer 2 Future consideration