Start and End Station Civil Expression for Offset Strings
We need an item type civil expression for offset strings from corridor strings (lines created by template points) providing start / end station in respect of that corridor alignment. Currently alignment name needs to be specified manually to the e...
about 1 year ago
in Item Types
0
Future consideration
Currently, civil labels with leaders do not support multiple leaders. We often label similar elements with a single label and multiple leaders. The civil label could read the data from the first element and then allow us to place multiple arrows. ...
Annotate Horizontal length along straight on profile
Requirement is to annotate horizontal length of straight on profile (station end - station start). It is available in frame annotation but not along linear so annotations don't match. Only the slope length can be annotated along the linear
When you create a new alignment, break a alignment and lose the turnouts or import a geometry it would be good to be able to re-associate or change the alignment to which a turnout are associated/connected to.For instance when I´m working with a c...
XSLT 3.0 introduces several new features and improvements that can enhance the development process, increase efficiency, and provide better results. Performance Improvements: XSLT 3.0 includes optimizations that can significantly improve the perfo...
Add Dynamics / Rules to Meshes produced by Create Closed Mesh Tool
Currently the Create Closed Mesh Tool produces static meshes which do not update when base elements change. When any of the base elements change, the existing meshes need to be deleted and created from scratch. We would like to see the following i...
over 2 years ago
in Modeling
0
Future consideration
Need ability to include General Project information in the IFC
This is the Feature Request to support the ability to include General Project information in the IFC. We would like to add several user-defined attributes to the IFC Site level, including "Organization Name", "Project Address", "Project Issue Date...
U.S. surveyors traditionally work in Northing & Easting, in that order. When working with Microstation V8i, AND with Inroads loaded, the user could perform precision drafting by using the “NE= “ key-in to enter the exact northing/easting coord...