Point Control lock to to start and lock to end option should honor the corridor start and end limits

Actually , the lock to start and lock to end stations are defined by the start and end of alignment or feature the corridor it is based on. This makes the point control handles (in the 2d view) to be outside the corridor limits when the corridor is shorter than the alignment, this resulting in multiple point control from other corridors overlap each other, making it hard to pick the one you want to modify.

Civil Product Used OpenSite Designer, OpenRoads Designer, OpenRail Designer