Usually, the bridge deck of a precast beam is an integral unit per span. In actual construction, the bridge deck may be constructed in sections for each beam. Is it possible to break the bridge deck into sections for each beam, and further divide the deck on each beam into segments at certain intervals?
Civil Product Used | OpenBridge Modeler |