Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenBridge Designer

Showing 126 of 1210

Ability to automatically generate 3d linear features/Linestrings from OBM elements

Generation of 2d decorations and solids are insufficient for full coordination with road geometry teams and they regularly need to provide 3d linestring geometry as part of the roadway design for bridge barriers, wingwall edges for earthworks, etc...
over 1 year ago in Modeling / OpenBridge Designer / OpenBridge Modeler 0 Needs review

Ability to speficy background color for active View

Being aware of what view is active is fundamental in ORD workflows. For now, active/inactive is shown with a light color difference in title bar and cannot be changed.I'd like to be able to specify hihglight color as I can specify active window co...

Allow population of annotations along Plan named boundary borders

Currently, profile named boundaries have the option to populate annotations using the named boundary border as a reference line. This is how the stations and elevations come in along the bottom of the boundary. Specifically in Indiana, we are aske...

Assign Superelevation to Approach Slab

The ability to Assign Superelevation to Approach Slabs would be good. If I use the Sync with Deck that does bank the approach slab but also extends the edge of the approach out to the fascia of the Bridge. Typically, our approach slab extends only...
6 months ago in OpenBridge Designer / OpenBridge Modeler / Superelevation 0 Future consideration

Edit Begin and End Support for Deck and Beam Groups

Let's say there are 4 spans and the user defines a bridge with 5 supports and the deck and beam groups run from support 1 to support 5. Then the engineer learns that we don't want this long of a bridge, only 3 spans. Please add the ability to chan...
12 months ago in OpenBridge Designer 0 Future consideration

Implement Beam hog modeling aligned to Australian Bridge design

Current Beam hog modeling is not as expected for Australian Bridges. Deck thickening can be applied, but the beams that support the deck do not follow the underside shape of the deck. The beams are straight, but really need to be curved and follow...
about 1 year ago in OpenBridge Designer / OpenBridge Modeler 0 Needs review

Implement a SWITCH/CASE function for item type expressions.

A SWITCH/CASE function would be easier to use than having to nest multiple IF functions.

Warning if we attach a dgn with ss4/ss10 schema data

As projects are still transitioning to ORD, I propose for a warning in ORD if someone tries to attach a reference dgn file that includes ss4/ss10 civil schema. As I understand it can be dangerous to mix these types of data especially if something ...
about 1 year ago in Functional Areas / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Allow multiple live load vehicles in Leap Bridge Steel to be exported to Substructure Analysis

Currently, when exporting the Leap Bridge Steel (LBS) to perform substructure analysis, you can only export one live load vehicle at a time. Our project has two separate vehicles to be analyzed. One workaround is to export the loads, close the fil...
about 1 year ago in Import/Export / OpenBridge Designer 0 Future consideration

Model horizontal cross bracing for steel girder bridge

Current OpenBridge Modeler version don't have ability to model horizontal cross bracing.
over 1 year ago in OpenBridge Designer / OpenBridge Modeler 0 Future consideration