Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1277

Assign Superelevation to Approach Slab

The ability to Assign Superelevation to Approach Slabs would be good. If I use the Sync with Deck that does bank the approach slab but also extends the edge of the approach out to the fascia of the Bridge. Typically, our approach slab extends only...
about 1 year ago in OpenBridge Designer / OpenBridge Modeler / Superelevation 0 Future consideration

use of activate and exchange

We are finding that our default model of a sheeted file is being clipped to what appears to be a named boundary. We have figured out that it happens upon usage of the Exchange and Activate commands to move to another model or file. We have asked o...
about 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Change Text Favorite element attachment/selections

When using text favorites that are based on an alignment (station/offset), these text favorites can break if the alignment changes or is dropped or it can't find it. As far as I know, when this happens, there is no way to reassign the text favorit...
over 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Project Geometry Using Active Feature Definition

When projecting various 2d geometry or 3d linear geometry the user is first required to set the active feature definition in the feature definition toolbar so that the project geometry shows up on the correct level, ect. It would speed things up i...
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Ability to produce station base report for existing rail strings

A station base report between existing rail strings (left rail, right rail) to determine values in the xml report viewer for existing gauge and cant or sixfoot and stagger
about 2 years ago in OpenRail Designer / Reports 0 Future consideration

Wants ability to put the x,y,z, of the centreline location of the crosssection in a text favorite and place this in the cross section.

Wants ability to put the x,y,z, of the centreline location of the crosssection in a text favorite and place this in the cross section. In addition the Raw data high and low coordinates of the namedboundary of a cross section are available. but whe...
about 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer 0 Future consideration

Add option to center cross sections on sheet

Add option to place a single column of sections per sheet and to center all the cross sections on the sheet.
about 1 year ago in Drawing Production / OpenRail Designer / OpenRoads Designer 0 Future consideration

Add the ability to perform evaluation and branching within Labeling tools

Before Survey Annotation tools were available within Open Roads, we used many VBA Feature Macros to generate all survey labels. As we were developing these, we realized that we could build some QA/QC checks into our code. For Example, we shoot sto...
over 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Allow assignment of VBA Macros by Feature Definition instead of by Alpha Code

In InRoads, multiple alpha codes assigned to a single Feature all shared the same custom codes and other survey settings. Having to duplicate any VBA Feature Macros to every alternative Alpha Codes complicates maintenance and is a source of uninte...
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Ability to drag and drop Point and Component Feature Definitions

We are able to drag and drop within the Active Template in the Components section to add or remove a child. We would like it to expand the ability to Point and Component Feature Definitions as well as Alternate Surfaces and Parametric Constraints....
over 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration