Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Drainage and Utilities

Showing 68

DU RIM Elevation calculated from Ground Elevation offset

The RIM Elevation is a stagnant number once you enter an elevation it does not update in relation to any surface changes. RIM Elevation would be better suited for use if it can be defined with an offset. Another field would be needed: RIM Depressi...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Display and Annotate Tap Nodes in Profile Drawing

The feature name (e.g. a number) of the tap node can be labeled in the plan.The tap is visible in the "Engineering Profile".It would be helpful if this could also be displayed and labeled in the profile view/drawing. How it should work: Tap Node i...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Make Grips Visible and Useable on 4k displays

When using Grips for Structures and Pipes - the grip blends too much into the background color, and on a 4K screen is TINY. The pipe grip is annoying to select (it only appears when I select the centerline of the pipe) but when adjusting or swapin...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 1 Future consideration

Allow for Hydraulic calculations and profile creation while using tap nodes

Tap nodes are incredibly useful but do not allow for hydraulic modeling or for profile runs. I'd prefer to use tap nodes over transitions because they are easier to use and do not break trunklines into segments. This would help with profiles, pipe...
6 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add report for information about pipe bends

Kindly add a non-graphical way of identifying whether a pipe contains bends or not and information about the coordinates. The report is required to produce pipe setting out schedules and share the coordinates with the contractor. It would be...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Commands to Place Node and Conduit <Type> (e.g. Place Manhole, Place Stormwater Conduit)

At the moment, you run Place Node, then set the type of node by picking a feature definition. However, you normally know what type of node that you want to place, such as a manhole for example,so it would be more intuitive if the ribbon contained ...
almost 3 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

limit the number of Rows in the Elevation-Area Table.

I get close to 40-50 rows of data when I assign a "pond" to a terrian. I only need data every 0.1ft but it is providing much more.
over 1 year ago in Drainage and Utilities 0 Future consideration

Calculation Summary ("Report") Improvement Suggestions

The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
7 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Visualization of Flood Fill based on min and max height values

A function of flood fill a portion of the terrain based on a min height and max height value. It allows a drainage engineer to visually check if a certain flood top water level will flow beyond the project boundary. Is there a way to do this in Op...
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

External model checking process - by possibly running a report to identify where 3d conduit string lines have been placed - i.e soffit, centre, invert, crown or base, this will ensure all output data of conduits are consistent for construction.

This is useful to enable a) - checks to be carried out, b) - to identify possible conduits that require amending - to align with all others. This will enable consistent and accurate output data to be produced, that can be used to construct from.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration