Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Bentley Civil Product Ideas

Showing 1745 of 1745

New Survey Linear Name

The create new survey linear tool needs to have the ability to name the element and set the field code. Currently, you have to select the new linear and enter the name and field code in the properties after it's created.
almost 3 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 1 Future consideration

Settings from Design Model should sync all 8 views in the view group

The saved view reference setting "Settings from Design Model" synchronizes the level display (and other settings) from view 1 in the reference file to ALL views in the master file. One efficient method of producing plans is to have a different lev...
5 months ago in Drawing Production / OpenRail Designer / OpenRoads Designer 3 Future consideration

Group Annotations into One Annotation Group Together.

This is a request to enhance the annotation groups. Can there be a toggle in the annotation group to have the ability to group the different annotation definitions together. For example, we have lots of annotation groups that have multiple text fa...
almost 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

Place Cross Section Named Boundary/Create Drawing - round top grid to nearest major interval

When creating cross sections, the user would like the option to round the top grid line to the nearest major interval. Currently, when creating cross sections, the top grid line (top of named boundary) is always the top elevation plus top clearanc...
over 2 years ago in Drawing Production 1 Future consideration

Name Changing Per Drainage Structure

When naming nodes, we usually associate that node name with the conduit, drainage area, and gutter name. But, if we have to update the node name (ex: 0401 to 0405), then we have to change all the other names manually. User is looking for possibili...
about 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

Including OverBridges, Noise wall and Large Gantries for Sight distance analysis

For the sight distance analysis, it would be good to include more complex scenarios, like OverBridges, noisewalls, Large Signage Gantries etc. which cannot be included in composite design surfaces.
almost 3 years ago in All Other / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer / OpenTunnel Designer 1 Future consideration

Ability to Synchronize ITL to a Master ITL

Either add ability for multiple users to be in the same ITL and save the information. At the moment we run a separate ITL for segments of a project which leads to slight differences to similar items. It is cumbersome to use the template library or...
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer 0 Future consideration

Copy multiple vertical elements

There's no option for copying multiple vertical elements - you can choose only one. My idea is to make the tool "Copy Vertical" similar to its equivalent in horizontal ("Copy Element") which allows to copy multiple elements.
over 1 year ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Being able to delete more than one point at a time within template creation.

Currently, you can click the delete components within templates and draw a line through any component(s) to delete it(them). It would be nice to have a similar function to delete points by encircling them so you do not have to delete them using th...
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Create cross sections from MicroStation elements

Ability to select lines for cross sections like in Geopak and to be able to import /export said lines for use. When you have miles of data and your sections are not perpendicular, selecting 2 end points per section is very time consuming.
almost 3 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 6 Future consideration