Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 1619

Add a "Description" entry to the Geometry Line Between Points Command

Allows the User to provide a Description for Geometry Lines; it should match the Geometry Point which already has a Description field.
almost 2 years ago in Geometry / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

RM Bridge update to use the correct AASHTO reduction factor for reinforced/prestressed concrete based on tensile strain in reinforcing at ultimate limit state.

The current RM bridge ultimate capacity calculations allow for material reduction factors only, which are not used by AASHTO for reinforced and prestressed concrete. AASHTO concrete reduction factors for flexure and P-M capacities are based on the...
over 1 year ago in OpenBridge Designer 0 Needs review

Civil Labeler - Elevations along Geometry with a given station range

It would be nice to be able to limit the elevation callouts (and other callout types) within a station range if possible. I.E > when labeling EOP/curb through an intersection, using the Elevation - Along geometry labels the entire element and t...
over 1 year ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

use of activate and exchange

We are finding that our default model of a sheeted file is being clipped to what appears to be a named boundary. We have figured out that it happens upon usage of the Exchange and Activate commands to move to another model or file. We have asked o...
over 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

External model checking process - by possibly running a report to identify where 3d conduit string lines have been placed - i.e soffit, centre, invert, crown or base, this will ensure all output data of conduits are consistent for construction.

This is useful to enable a) - checks to be carried out, b) - to identify possible conduits that require amending - to align with all others. This will enable consistent and accurate output data to be produced, that can be used to construct from.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

[Completed]Element Annotation and/or Civil Labeler Slopes for Complex Lines

It would be amazing if the "Element Annotation" or "Civil Labeler" could provide individual slopes for complex lines in plan view in a seamless automated way. The text favorite I've been wanting to use is "Plan Annotation.Profile Ahead Grade" whic...
almost 2 years ago in Annotation / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

Ability to produce station base report for existing rail strings

A station base report between existing rail strings (left rail, right rail) to determine values in the xml report viewer for existing gauge and cant or sixfoot and stagger
over 2 years ago in OpenRail Designer / Reports 0 Future consideration

[RM Bridge] Enable right-click menu for the side graphic window when the main graphic windows do not show the model

This is a feature request for RM Bridge 1. When the main graphic windows show the model, the right-click menu is enabled for the the side graphic window Please refer to attached 1.png. 2. But when the main graphic windows does NOT show the model, ...
almost 2 years ago in OpenBridge Designer / User Interface 0 Needs review

Revise Limitation to LEAP/RC-Pier Wind Load Auto Generation Tool

I have brought the limitation to the Wind Load Auto Generation tool in the past, but this is becoming more important and an issue now, since I’ve been getting many comments from our clients and my coworkers on this. Currently, the wind load auto g...
over 1 year ago in OpenBridge Designer 0 Future consideration

Allow the Text Import Wizard to process Geopak Drainage survey source files without editing

In order to export drainage data, two items must be noted during the field collection. Each pipe must have a size and condition. These must be placed as the first characters in the description field separated by a space. If two different sizes are...
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration