Place one bearing at pier location for continuous span concrete girder bridge design
Ability to place only one bearing at pier location for continuous span concrete girder bridge design, two girders shearing one bearing at pier location.
The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
Text Favorite: add Dynamic N,E,S,W preffix for MH labels
Add ability to have dynamic direction- N,E,S,W preffix in the label for MH labels Text Favorites. In Auto CAD the option is called "pipe direction". Following is the example of output required. (S) INV 99.8m (N) INV 99.7M
Please add a variable MS_LEVEL_DO_NOT_OVERRIDE_DESIGN_LEVELS_IN_DRAWING that does what MS_LEVEL_DO_NOT_OVERRIDE_DESIGN_LEVELS_IN_SHEET does for sheets but for drawings
IDS as Information Delivery Specification is a standard comes from buildingSMART which ensure openBIM pricipes for exchange of information requirements and validation. Please check at https://www.buildingsmart.org/what-is-information-delivery-spec...
Our current standard workflow for roadway corridor modeling is to create a pavement corridor then a corridor for each end condition Rt and Lt. I have seen many others including some Bentley folks use this method. It would be big time saver to have...